|
![]() |
Total Space Available | 110,526 SF | Park Type | Industrial Park |
Min. Divisible | 5,613 SF |
Total Space Available | 110,526 SF |
Min. Divisible | 5,613 SF |
Park Type | Industrial Park |
Display Rental Rate as
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
1st Floor | 5,613-69,518 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request | Industrial | - | Now |
- Available with 60 day notice - End Cap Suite with Frontage & Visibility on Pinnacle Peak Road - Total Office Area: ±5,533 SF - North Office: ±4,380 SF - South Office: ±1,153 SF - Warehouse Area: ±35,475 SF - 10’X10’ Dock High Doors: 7 - 12’X14’ Grade Level Doors: 2 - 16’x20’ Grade Level Door: 1 - Evaporative Cooled Warehouse - Clear Height: ±30’ - 180’ Truck Court - ESFR Fire Sprinklers - A-1 Zoning
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
1st Floor - 100 | 41,008 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request | Industrial | - | 60 Days |
Size | 5,613-69,518 SF |
Term | Negotiable |
Rental Rate | Upon Request |
Space Use | Industrial |
Condition | - |
Available | Now |
Size | 41,008 SF |
Term | Negotiable |
Rental Rate | Upon Request |
Space Use | Industrial |
Condition | - |
Available | 60 Days |
- Available with 60 day notice - End Cap Suite with Frontage & Visibility on Pinnacle Peak Road - Total Office Area: ±5,533 SF - North Office: ±4,380 SF - South Office: ±1,153 SF - Warehouse Area: ±35,475 SF - 10’X10’ Dock High Doors: 7 - 12’X14’ Grade Level Doors: 2 - 16’x20’ Grade Level Door: 1 - Evaporative Cooled Warehouse - Clear Height: ±30’ - 180’ Truck Court - ESFR Fire Sprinklers - A-1 Zoning
Situated at the SWC of Pinnacle Peak Road and 7th Street, with two (2) direct arterials to major freeways providing great access to all of metropolitan Phoenix. Located adjacent to the Deer Valley Airport. Located ±10 minutes away from the $165 billion Taiwan Semiconductor Manufacturing Corporation (TSMC) multi-phase project which completed its first building in 2024 with a plan to be operational in 2025.