|
![]() |
Display Rental Rate as
• 530 Acre Park with 90 acres of shovel ready sites along Thom Lambert Blvd • Flexibility to accommodate Build to Suits • Heavy Industrial Zoning • 1.5 miles of frontage on BNSF rail line and Highway 287 • Regional Drainage • Power provided by Wise County Electrical Cooperative and Oncor • Natural Gas Provided by Atmos • Incentives available via Decatur EDC
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
1st Floor | 20,000-1,000,000 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request | Industrial | Partial Build-Out | March 01, 2026 |
Size |
20,000-1,000,000 SF |
Term |
Negotiable |
Rental Rate |
Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request |
Space Use |
Industrial |
Condition |
Partial Build-Out |
Available |
March 01, 2026 |
Size | 20,000-1,000,000 SF |
Term | Negotiable |
Rental Rate | Upon Request |
Space Use | Industrial |
Condition | Partial Build-Out |
Available | March 01, 2026 |
• 530 Acre Park with 90 acres of shovel ready sites along Thom Lambert Blvd • Flexibility to accommodate Build to Suits • Heavy Industrial Zoning • 1.5 miles of frontage on BNSF rail line and Highway 287 • Regional Drainage • Power provided by Wise County Electrical Cooperative and Oncor • Natural Gas Provided by Atmos • Incentives available via Decatur EDC